Main overhaul) of a 19.1 MW SST 300 Turbine in Plovdiv

Art KD_8_1_Z2 Kerndaten für die Bekanntmachung von zu vergebenden Aufträgen, Rahmenvereinbarungen und die Einrichtung bzw. Einstellung von dynamischen Beschaffungssystemen
Bezeichnung Main overhaul) of a 19.1 MW SST 300 Turbine in Plovdiv
Kategorie (CPV Hauptteil) 45259300 Reparatur und Wartung von Heizanlagen
NUTS BG БЪЛГАРИЯ (BULGARIA)
Auftraggeber
  • EVN Business Service GmbH 
    +43 2236 200 12119
    stefan.mandl@evn.at
    Prok. Ing. Stefan Mandl, BA, MLS
    Geschäftszahl: 2020/S 160-390931 // SMA-2008140003
Lieferant
Verfahrensart Verhandlungsverfahren
URL https://beschaffung.evn.at
Art des Auftrags Bauauftrag
Beschreibung According maintenance plan of turbine producer after 60000
operation hours main overhaul of the turbine set should be done. The
scope of activities includes inspection service activities on next main
components:
1. Steam turbine model H2L/ V36UB including casing, rotor,
bearings, valves, turbine foundation (between turbine and oil tank
plus spring suspection between oil tank and concrete foundation),
piping, ESV, Control valve and Main steam shut off valve;
2. Couplings and the gearbox type TX 80 / 5 C
3. Auxiliary systems for lubrication oil including all pumps, oil
tank, oil coolers, filters, pipelines, shut-off fittings, valves and orifices;
4. Control oil system including all control pipelines, shut-off
fittings, other system fixtures and valves and orifices;
5. Instrument and compressed air system of steam system;
6. Drain system including all pipelines, shut-off fittings, other
system fixtures and valves and orifices;
7. Gland steam system all pipelines, shut-off fittings, other
system fixtures, valves, orifices, air fans, filters and heat exchangers;
8. Steam turbine installation package including internal
electrical systems.
9. Process automation system for the steam turbine installation
unit inclusive of the safety system
10. Electrical generator type AMS 1000LM up to the outlet
terminals including exciter, PMG and all of their auxiliary components;
11. Generator auxiliary systems- remote control of Generator,,
cooling system including all units, fittings and exchangers.
Angabe des geplanten Ausführungsbeginns 01.04.2021
Endzeitpunkt / Erfüllungszeitpunkt 31.05.2021
Schlusstermin für den Eingang 11.09.2020
Rahmenvereinbarung ja
Tag der erstmaligen Verfügbarkeit 19.08.2020
Letzte Änderung der Ausschreibung 19.08.2020
Version 1, XML, zuletzt aktualisiert: 19.08.2020